Select the node with the name of the task to get to the groups of the project task tree.
At the bottom of the page there are 3 buttons:
There are groups of three types: Item group, Report group, Table group, see task tree. For each of this group, its own editor will be shown:
Use buttons in the right panel of the page to edit Client and Server modules of a selected group, see